Added a mirror to the path moved the mirror from the path went back to top down with a slightly adjusted throw then rebuilt a light tube to allow for the led to be added and removed for testing
purposes. Time to start looking at the sweeper mechanism
 |
straight z with adjustable height |
In the picture above you can see the projector is finally mounted to the frame albeit temporarily I think this is becoming the final setup. The frame is likely to be moved around some more to make room for the z screw when it arrives and the sweeper.
 |
collimator attached to light-pipe with 90 degree pipe |
I plan on adding a mechanical shutter on the collimator side, and attaching the power led to the shutter.
No comments:
Post a Comment